Whip Poles and Gantries at Kralingseplein, Rotterdam

VDL Mast Solutions installs poles for a key traffic connection
On behalf of the Municipality of Rotterdam, VDL Mast Solutions successfully completed the installation of new whip poles and gantries at the busy Kralingseplein. This major traffic junction is one of the most important connections in the region, linking Rotterdam, Capelle aan den IJssel, and the A16/Brienenoord Bridge.

With the installation of these poles and gantries, the Kralingseplein infrastructure has been made future-proof once again and now meets the highest standards of quality and traffic safety.

Executed in collaboration with specialized partners
For this project, VDL Mast Solutions worked closely with several expert partners, each contributing their own specialty:

VSVK – foundation pipe installation
Fugro – geotechnical survey
Hoeflake – electrical work
BUKO – traffic management
Boskalis – asphalt works


Thanks to this close cooperation, the work was carried out efficiently, safely, and according to schedule.

Complex installation on a busy traffic hub
Kralingseplein is an intensively used roundabout with a high volume of heavy traffic. During installation, the junction had to remain fully accessible, adding an extra layer of complexity. Through careful planning, tight coordination, and flexible execution, the installation of the new whip poles and gantries was completed with minimal disruption for road users.

Proud of the result and craftsmanship
“The installation at Kralingseplein was a challenging project at a crucial location,” says VDL Mast Solutions. “Thanks to the dedication of our team and the cooperation with our partners, we successfully completed the installation. We are proud that our mast solutions contribute to road safety and infrastructure improvement throughout the Netherlands.”